Posted Mon, 08 May 2023 18:43:37 GMT by Huang, Siyuan
I am using KITE with 4200 SCS to do 3 channel measurement. I need to run (Vgate sweeping and take down Ids) * 2 every 10 min. Currently, I need to click the run button and append button every 10 min. Is there a way to automate this process such as add a 10 min waiting time between every 5 measurements? Thanks!
Posted Mon, 08 May 2023 18:47:33 GMT by Huang, Siyuan
this is the interface I am working on
Posted Thu, 11 May 2023 19:14:26 GMT by C, Andrea
At subsite level in the project, go to subsite setup and enable Cycle Mode.<br> Then if you highlight the subsite when clicking the Run button, all enabled tests under that level will be executed once per cycle.&#160; The data will appear at each test but rather than Append2, Append3, etc.&#160; They will be cycle1, cycle2, etc.<br> <br> How to also have some pause for 10 minutes for each cycle?<br> Do you have the compiler a the KULT tool is functional on your 4200?<br> If yes, you could make a simple routine that waits for the desired duration before returning control back to KITE for the cycles to continue.<br> <br> NOTE:&#160; on the new 4200A-SCS, the compiler is always there.&#160; Older 4200-SCS, depending on vintage, needed it installed as an option.&#160; Open the KULT tool from desktop icon and see if it complains or not.
Posted Tue, 16 May 2023 18:16:49 GMT by Huang, Siyuan
<p>Thank you, Andrea. How could I enable Cycle mode?</p> <p></p>
Posted Tue, 16 May 2023 18:46:49 GMT by Huang, Siyuan
<p>Is it possible to schedule a zoom meeting? Got confused by all the buttons</p>

You must be signed in to post in this forum.